Project database for project team only. Last update 27.7.2016:
- Client – Stirling Ackroyd
- Landlord – private
- Contractor – Petrit
- Architect – mail@spaceagent.com
- M+E contractor –
- Approved Inspector – iain@buildingcontrolapproval.com
- Engineer –
BRIEF 10%
A. Inception
- Site map (bing)
- Street view (google)
- KIN_P01-DRAFT plan 22.3.2016
B. Feasibility
DESIGN 35%
C. Outline design (client)
- KIN_P01a-DRAFT plan 13.4.2016
- KIN_P01d – DRAFT floor area swap 11.5.2016 (in-principle)
- KIN_DRAFT floor area swap plan revG 26.7.2016
D. Scheme design (planning)
E. Technical design (building control)
SPECIFICATION 70%
F. Production information
G. Tender documentation
H. Tender action (contractor)
CONSTRUCTION 100%
I. Appointment
J. Construction
L. Completion