Project database for project team only. Last update 13.12.2014.
BRIEF 10%
A. Inception
B. Feasibility
DESIGN 35%
C. Outline design (client)
D. Scheme design (planning)
- Camden – planning consent (main building) + s106
- NAR14 – proposed planning scheme revG2 19.1.2013
- NAR14_P03g3 and NAR12_P03g2 – joint rear elevation 3.4.2014
E. Technical design (building control)
SPECIFICATION 70%
F. Production information
G. Tender documentation
H. Tender action
CONSTRUCTION 100%
I. Appointment (contractor)
J. Construction
L. Completion