Project database for project team only. Last update 27.6.2016.
- Client – private
- Contractor – SOLT Ltd (Co No 6773973)
- Structural Engineer – David Berle <dabstruct@btinternet.com>
BRIEF 10%
A. Inception
B. Feasibility
DESIGN 35%
C. Outline design (client)
D. Scheme design (planning)
- OKE – Brent planning file 15/3570 (appeal)
- OKE_ proposed scheme revG 17.8.2015
- OKE – Basement Impact Assessment by David Berle 14.8.2014
- BRENT – planning file 16/2721 (CLD)
- OKE_CLD scheme revN1 16.6.2016
- BRENT – planning file 16/2729 (prior app)
- OKE_PRIOR APP scheme revM1 16.6.2016
E. Technical design (building control)
SPECIFICATION 70%
F. Production information
G. Tender documentation
H. Tender action (contractor)
CONSTRUCTION 100%
I. Appointment
J. Construction
L. Completion