Project database for project team only. Last update 7.7.2020:
- Client – private
- Contractor (principle contractor) – david@solt.build
- Architect (principle designer) – mail@spaceagent.com
- Structural Engineer – jenna@redstonassociates.co.uk
- Party Wall Surveyor – nigel@conwayassociates.co.uk
- Asbestos survey – surveys24@rocketmail.com
- Drainage survey – Gerry
- SuDS report – George
- Building Control – RBKC
- Steelwork supplier –
- Glazing supplier –
BRIEF 10%
A. Inception
- Street view (bing)
- Site map (google)
- Kensington and Chelsea – planning history
- PEM_Location plan
- PEM_Site plan
- PEM_existing drawings 22.5.2020
B. Feasibility
DESIGN 35%
C. Outline design (client/pre-app)
D. Scheme design (planning)
- Kensington and Chelsea – planning file PP/20/03455
- PEM – planning consent 8.9.2020
- PEM – consented planning proposal revC5 3.9.2020
- Kensington and Chelsea – SuDS discharge file PP/21/01567
E. Technical design (building control)
SPECIFICATION 70%
F. Production information
G. Tender documentation
H. Tender action (contractor)
CONSTRUCTION 100%
I. Appointment
J. Construction
L. Completion