programme DRAFT

Project database for project team only. Last update 26.3.2015:

  • Client –
  • Land surveyor –
  • CDM –
  • Contractor –
  • Architect – www.spaceAgent.com
  • Structural Engineer –
  • Party Wall Surveyor –
  • Approved Inspector –
  • Code Assessor/SAP –
  • Ecology report –
  • Sound test –
  • Insurer –

BRIEF 10%

A. Inception

  • site location
  • Land registry/title
  • planning constraints
  • permitted development

B. Feasibility

  • budget

DESIGN 35%

C. Outline design (client)

D. Scheme design (planning)

  • Planning
  • CIL
  • Affordable housing contribution
  • Basement Impact Assessment

E. Technical design (building control)

SPECIFICATION 70%

F. Production information

G. Tender documentation

H. Tender action (contractor)

CONSTRUCTION 100%

I. Appointment

J. Construction

L. Completion