Project database for project team only. Last update 20.4.2018
- Client – privat
- Contractor – Momy/Arik
- Architect – mail@spaceagent.com
- Interior Architect / Designer – sev@sevspacez.com
- Structural Engineer – Mokhtar and Rommel
- Party Wall Surveyor – Robin
- Basement works – Corbyn
- Waterproofing – Vince
- Drainage – Richard
- Pool – Penguin
BRIEF 10%
A. Inception
- Street view (bing)
- Site map (google)
- GRG_location-plan
- GRG_existing-drawing-fnq-110
- BARNET – planning history
B. Feasibility
DESIGN 35%
C. Outline design (client)
D. Scheme design (planning)
- BARNET planning file
- GRG_proposed prior app scheme revC3 20.1.2017
- GRG_DRAfT GA revF – basement pool 17.7.2017
- BARNET planning file 17/7787/HSE 13.12.2017
- GRG – basement pool revG 13.12.2017
E. Technical design (building control)
SPECIFICATION 70%
F. Production information
G. Tender documentation
H. Tender action (contractor)
CONSTRUCTION 100%
I. Appointment
J. Construction
- GRG – Structural scheme for construction 1733-1,2 Rev A
- GRG – Drainage layout for construction 7375.P094-96.C2
- GRG – GA basement pool revH2 25.2.2018
- GRG – P06h3 – lower pool level 19.4.2018 – cut-out
L. Completion