Project database for project team only. Last update 9.7.2015:
- Client – eli@practicalbuildingsolutions.co.uk
- Contractor – mr.bsolomon@gmail.com
- Architect – mail@spaceagent.com
- Structural Engineer – mms@shayaassociates.co.uk
- Party Wall Surveyor – mms@shayaassociates.co.uk
- Approved Inspector – www.completebuildingcontrol.co.uk
- CDM Coordinator – mms@shayaassociates.co.uk
- Health & Safety Advisor – cturner@tbconsult.co.uk
- Code Assessor/SAP – www.masefields.co.uk
- Ecology report – Abigail Bridge Ecological Services
- Site Investigation – Herts & Essex Site Investigations
HSE: PCI – revA 17.3.2015 | F10 – 20.3.2015 | CPP – revA 25.4.2015
BRIEF 10%
A. Inception
- Site map
- Street view
- BARNET planning history
- TGO – existing survey April 2014 by Great Plans
- TGO_P02k – re-survey 14.1.2015 – overlay by Jon Tanton
- H+E SI 12812 – 2a The Grove, London, NW11 9SH – SI Report – 16.6.2015
B. Feasibility
DESIGN 35%
C. Outline design (client)
D. Scheme design (planning)
- BARNET – planning case file F/04761/14
- TGO_consented planning scheme revK 13.11.2014
- BARNET – F_04761_14-UNILATERAL_UNDERTAKING – 10.12.2014
- BARNET – Decision Notice – 18.12.2014
- BARNET – conditions discharge file 15/01060/CON
- BARNET – approved conditions revP 21.4.2015
- TGO_consented scheme revP 21.4.2015
- TGO – Demolition and Construction Management Plan 19.2.2015
- TGO – schedule of external finishes 10.3.2015
E. Technical design (building control)
SPECIFICATION 70%
F. Production information
- TGO – SHAYA L15_011_01 SE drawings March 2015
- TGO – SHAYA L15_011_01 SE calculations March 2015
- TGO_consented scheme revP 21.4.2015
G. Tender documentation
H. Tender action (contractor)
CONSTRUCTION 100%
I. Appointment
J. Construction
L. Completion